Cross-zonal capacity - 70% target

LinkedIn LinkedIn Copy Link Copy Link

The 70% target

​​​​​​​​​​​​​​​​​​​​​Maximising cross-zonal trading opportunities is a core element to ensure an efficient internal electricity market. It is also important for meeting a number of future challenges in Europe's energy trajectory, including the decarbonisation targets.

The Clean Energy Package offers a new opportunity to increase the capacity offered for cross-zonal trade. In particular, Transmission System Operators are required to ensure that at least 70% of the transmission capacity is offered for cross-zonal trade, while respecting operational security limits. ​

What's the role of ACER?

​The 70% target has become a key element of market integration, which requires intensive monitoring. To ensure a harmonised approach on how to monitor the achievement of the minimum level of available cross-zonal capacity (MACZT), ACER will monitor the MACZT in relation to the 70% target.

The results will be regularly published in dedicated reports. 

 

 

ACER to decide on the electricity cross-zonal capacity allocation methodologies for the exchange of balancing capacity in 19 EU Member Stateshttps://acer.europa.eu/Media/News/Pages/ACER-to-decide-on-the-electricity-cross-zonal-capacity-allocation-methodologies-for-the-exchange-of-balancing-capacity-.aspx11/04/2021 23:00:00ACER to decide on the electricity cross-zonal capacity allocation methodologies for the exchange of balancing capacity in 19 EU Member States
ACER and energy regulators will draft new Framework Guidelines on sector-specific cybersecurity rules for cross-border electricity flowshttps://acer.europa.eu/Media/News/Pages/ACER-and-energy-regulators-will-draft-new-Framework-Guidelines-on-sector-specific-cybersecurity-rules-for-cross-border-elec.aspx24/02/2021 00:00:00ACER and energy regulators will draft new Framework Guidelines on sector-specific cybersecurity rules for cross-border electricity flows
ACER adopted a Decision on the Amendment of the Fallback Procedures of the Core Capacity Calculation Regionhttps://acer.europa.eu/Media/News/Pages/ACER-adopted-a-Decision-on-the-Amendment-of-the-Fallback-Procedures-of-the-Core-Capacity-Calculation-Region.aspx29/03/2021 23:00:00ACER adopted a Decision on the Amendment of the Fallback Procedures of the Core Capacity Calculation Region