PC_2012_G_14 - Public Consultation on ​Draft Framework Guidelines on rules regarding harmonised transmission tariff structures for gas

Status
Closed
Open:
05.09.2012
Close:
05.11.2012
Policy area
Contact information
Audience

Overview

​​​From 5 September 2012 to 5 November 2012 The Agency for the Cooperation of Energy Regulators (ACER) is running a public consultation on on ​Draft Framework Guidelines on rules regarding harmonised transmission tariff structures for gas.

Interested parties will have to assess the Draft Framework Guidelines and answer to the relevant  questions in the accompanying Questionnaire until 5th of November 2012, 23:59 CET.​

The draft Framework Guidelines, which the Agency for the Cooperation of Energy Regulators (ACER) is preparing pursuant to Article 6 of Regulation (EC) No 715/2009 and on the basis of a request from the European Commission dated 29 June 2012, apply to the transmission services offered at all entry and exit points of gas Transmission System Operators (TSOs), irrespective of whether they are physical or virtual.​

Consultation documents

​The Agency presents for public consultation two key documents:​

Please note that Evaluation of Responses of previous ACER Public Consultation on Scope and main policy options for Framework Guidelines on Harmonised transmission tariff structures is presented  as  a supporting document to this consultation. Please also note that during the consultation, ACER will also provide on its website additional supporting documentation on Initial Impact Assessment, which shall provide stakeholders with more context on the two above key documents.

You can also find here the Brattle Group report on Impact Assessment for the Framework Guidelines on Harmonized transmission Tariff Structures.