Cross-zonal capacities and the 70% margin available for cross-zonal electricity trade (MACZT) - 2023 Market Monitoring Report

Document type
Department
Month
July 
Feedback
On
Feedback form
Description

ACER’s monitoring finds much at stake as grid operators are still far off making 70% transmission capacity available for cross-zonal electricity trade.

Year
2023
Image

ACER Report on Investment Evaluation, Risk Assessment and Regulatory Incentives for Energy Network Projects

Document type
Department
Month
June 
Feedback
On
Feedback form
Description

The 2023 report reveals that transmission system operators’ (TSOs’) risks are primarily addressed through the default national mitigation measures.

Year
2023
Image

ACER Consolidated report on the progress of electricity and gas Projects of Common Interest (PCIs)

Document type
Department
Month
June 
Feedback
On
Feedback form
Description

ACER’s 2023 PCI monitoring report found that the total cost of PCIs in 2023 is EUR 81.2 billion, which reflects a 10% increase compared to 2022.

Year
2023
Image
Electricity pylon and gas pipelines

10th ACER Report on Congestion in the EU Gas Markets and How it is Managed

Document type
Department
Month
May 
Feedback
On
Feedback form
Description

In its 10th report on congestion in the EU gas markets, ACER finds a tripling of network congestion. ACER calls on gas TSOs and NRAs to relieve the bottlenecks.

Year
2023
Image
Gas Pipes