Icon
Electricity

PC_2022_E_08 - Public Consultation on the amendments to the grid connection network codes

Status
Closed
Open:
26.09.2022
Close:
28.11.2022
Policy area
Electricity-grid connection
Contact information
Audience
Interested stakeholders

Contact information

Responses and Evaluation of Responses

ACER policy paper on the revision of the network code on requirements for grid connection of generators and the network code on demand connection

Document type
Department
Month
September 
Feedback
Off
Feedback form
Description

ACER sets out in its policy paper potential ways to improve the network code on requirements for grid connection of generators and the network code on demand connection.

Year
2022
Image
car

PC_2022_E_07 - Public consultation on the revision of maximum and minimum electricity price methodologies

Status
Closed
Open:
19.09.2022
Close:
09.10.2022
Policy area
Maximum and minimum prices in the day-ahead and intraday electricity markets
Contact information
Audience
Interested stakeholders

Contact information

ACER Implementation Monitoring Report of the System Operation Guideline 2022

Document type
Department
Month
July 
Feedback
On
Feedback form
Description

ACER has published the first Implementation Monitoring Report on the progresses made in implementing the EU-wide guideline on electricity transmission system operation (the System Operation Guideline).

Year
2022
Image