- Introduction
-
FAQs on transaction reporting on supply and derivative contracts
-
II.1. TRUM
-
II.1.1 General questions
- Question 1.1.1
- Question 1.1.2
- Question 1.1.3
- Question 1.1.4
- Question 1.1.5
- Question 1.1.6
- Question 1.1.7 [DELETED]
- Question 1.1.8
- Question 1.1.9
- Question 1.1.10
- Question 1.1.11
- Question 1.1.12
- Question 1.1.13
- Question 1.1.14
- Question 1.1.15
- Question 1.1.16
- Question 1.1.17
- Question 1.1.18
- Question 1.1.19
- Question 1.1.20
- Question 1.1.21
- Question 1.1.22
- Question 1.1.23
- Question 1.1.24
- Question 1.1.25
- Question 1.1.26
- Question 1.1.27 [ARCHIVED]
- Question 1.1.28
- Question 1.1.29
- Question 1.1.30
- Question 1.1.31
- Question 1.1.32
- Question 1.1.33
- Question 1.1.34
- Question 1.1.35
- Question 1.1.36
-
II.1.1 General questions
-
II.2. Questions related to standard contracts
-
II.2.1 TRUM – Data Fields () and XSD schema Table
- Question 2.1.1 Data Field (1) and (8)
- Question 2.1.2 Data Field (2)
- Question 2.1.3 Data Field (3)
- Question 2.1.4 Data Field (3)
- Question 2.1.5 Data Field (4)
- Question 2.1.6 Data Field (4)
- Question 2.1.7 Data Field (8) [DELETED]
- Question 2.1.8 Data Field (8)
- Question 2.1.9 Data Field (8)
- Question 2.1.10 Data Field (9)
- Question 2.1.11 Data Field (11)
- Question 2.1.12 Data Field (15)
- Question 2.1.13 Data Field (15)
- Question 2.1.14 Data Field (21)
- Question 2.1.15 Data Field (21)
- Question 2.1.16 Data Field (21) [ARCHIVED]
- Question 2.1.17 Data Field (21)
- Question 2.1.18 Data field (21) and (22)
- Question 2.1.19 Data Field (23)
- Question 2.1.20 Data Field (25)
- Question 2.1.21 Data Field (25)
- Question 2.1.22 Data Field (27)
- Question 2.1.23 Data Field (27)
- Question 2.1.24 Data Field (28)
- Question 2.1.25 Data Field (28)
- Question 2.1.26 Data Field (30)
- Question 2.1.27 Data Field (30)
- Question 2.1.28 Data Field (30)
- Question 2.1.29 Data Field (30)
- Question 2.1.30 Data Field (31) [ARCHIVED]
- Question 2.1.31 Data Field (31)
- Question 2.1.32 Data Field (31)
- Question 2.1.33 Data Field (35) and (38)
- Question 2.1.34 Data Field (35), (38), (40), (41) and (42)
- Question 2.1.35 Data Field (39)
- Question 2.1.36 Data Field (40)
- Question 2.1.37 Data Field (43)
- Question 2.1.38 Data Fields (48 to 57)
- Question 2.1.39 Data Field (48)
- Question 2.1.40 Data Field (48)
- Question 2.1.41 Data Field (48)
- Question 2.1.42 Data Field (48)
- Question 2.1.43 Data Field (48)
- Question 2.1.44 Data Fields (49) and (50)
- Question 2.1.45 Data Fields (49) and (50)
- Question 2.1.46 Data Field (51) [DELETED]
- Question 2.1.47 Data Field (52)
- Question 2.1.48 Data Field (53)
- Question 2.1.49 Data Field (53)
- Question 2.1.50 Data Field (54)
- Question 2.1.51 Extra field in the schema
- Question 2.1.52 Extra field in the schema
- Question 2.1.53 Extra Field in the schema
- Question 2.1.54 Local flexibility products
- II.2.2 Trading examples – Annex II
- II.2.3 Derivatives
- II.2.4 Lifecycle events
- II.2.5 Back loading of standard contracts [ARCHIVED]
- II.2.6 Questions related to bilateral trades
- II.2.7 Questions related to ACER’s No-action Letter
-
II.2.1 TRUM – Data Fields () and XSD schema Table
-
II.3. Questions related to non-standard contracts
-
II.3.1 General questions: non-standard contracts
- Question 3.1.1
- Question 3.1.2 [DELETED]
- Question 3.1.3
- Question 3.1.4
- Question 3.1.5
- Question 3.1.6
- Question 3.1.7
- Question 3.1.8
- Question 3.1.9
- Question 3.1.10
- Question 3.1.11
- Question 3.1.12
- Question 3.1.13
- Question 3.1.14
- Question 3.1.15
- Question 3.1.16
- Question 3.1.17
- Question 3.1.18
- Question 3.1.19
- Question 3.1.20
- Question 3.1.21 [DELETED]
- Question 3.1.22 [DELETED]
- Question 3.1.23 [DELETED]
- Question 3.1.24 [DELETED]
- Question 3.1.25 [DELETED]
- Question 3.1.26 [DELETED]
- Question 3.1.27
- Question 3.1.28
- Question 3.1.29
- Question 3.1.30
- Question 3.1.31
- Question 3.1.32
- Question 3.1.33
- Question 3.1.34
- Question 3.1.35
- Question 3.1.36
- Question 3.1.37
- Question 3.1.38
- Question 3.1.39
- Question 3.1.40
- Question 3.1.41
- Question 3.1.42
- Question 3.1.43 [DELETED]
- Question 3.1.44
- Question 3.1.45
- Question 3.1.46
- Question 3.1.47
- Question 3.1.48 [DELETED]
- Question 3.1.49 [DELETED]
- Question 3.1.50
- Question 3.1.51
- Question 3.1.52
- Question 3.1.53
-
II.3.2 TRUM – Data Fields () and XSD schema for Table 2
- Question 3.2.1 Data Field (3)
- Question 3.2.2 Data field (11) [ARCHIVED]
- Question 3.2.3 Data field (12)
- Question 3.2.4 Data field (16) and (18)
- Question 3.2.5 Data field (19)
- Question 3.2.6 Data field (21), (22) and (23)
- Question 3.2.7 Data field (21)
- Question 3.2.8 Data field (24)
- Question 3.2.9 Data field (24) to (31)
- Question 3.2.10 Data field (24) to (30)
- Question 3.2.11 [DELETED]
- Question 3.2.12 Data field (28)
- Question 3.2.13 Data field (28) and (29)
- Question 3.2.14 Data field (30)
- Question 3.2.15 Data field (42)
- II.3.3 Trading examples – Annex II
- II.3.4 Executions under non-standard contracts
- II.3.5 Lifecycle events
- II.3.6 Back loading of non-standard contracts [ARCHIVED]
-
II.3.1 General questions: non-standard contracts
-
II.1. TRUM
-
FAQs on transaction reporting of transportation contracts
- III.4.1 Electricity
-
III.4.2 Gas
- Question 4.2.1
- Question 4.2.2
- Question 4.2.3
- Question 4.2.4
- Question 4.2.5
- Question 4.2.6
- Question 4.2.7 Reporting of capacity conversion and capacity upgrade
- Question 4.2.8
- Question 4.2.9
- Question 4.2.10
- Question 4.2.11
- Question 4.2.12
- Question 4.2.13
- Question 4.2.14
- Question 4.2.15
- Question 4.2.16 [DELETED]
- Question 4.2.17
- Question 4.2.18 [DELETED]
- Question 4.2.19
- Question 4.2.20
- Question 4.2.21
- Question 4.2.22
- Question 4.2.23
- Question 4.2.24
- Archive: FAQs on backloading
Question 4.1.5
How to delete incorrect Total Allocation reports? In Table 1 or Table 2 we can use the field “Action Type”. What would be the solution in Table 3? Should we use Field 11 for “Document Status” with code A13 (Withdrawn)?
Answer
In Table 3, Data field No (2) ‘Document version’ has to be updated. The document version is used to identify a given version of a time series set for a given bid period. Each resubmission of a document (where the document is identified by field (1) ‘Document identification’) should be submitted by incrementing the value of the field (2) ‘Document version’ by 1. Note that the system will only accept a document with a Document version number which is greater than the previous Document version number of the same document.
For Rights: Data Field No (11) Document status (XSD: 'docstatus') shall be populated with code A13 (Withdrawn).
Total allocation and Bids do not have Data Field No (11) Document status, therefore, in case of a need to withdraw these documents a higher version of the relevant document only with a header without TimeSeries should be sent.