Status
Closed
Open:
03.08.2012
Close:
30.09.2012
Policy area
Contact information
Audience
PC_2012_E_13 - Public Consultation on Forward Risk Hedging Products & Harmonisation of Long Term Capacity Allocation rules
Status
Closed
Open:
29.08.2012
Close:
28.10.2012
Policy area
Contact information
Audience
Evaluation of responses and responses
- 120727 EAI Response to ACER Consultation on Forward Risk Hedging Products FINAL.pdf
- 121002_ACER_Long_Term_final.pdf
- 121026-ENTSO-E response to ACER Consultation on forward risk-hedging.pdf
- 121028 Forward hedging products and harmonisation.pdf
- 2012_10_26_CAO_Response_to_PC_2012_E_13_Consultation.pdf
- 20121011_AG_Comments_41_2012 ACER Forward Markets_20121025_AG.pdf
- 2012-10-19_ACER long term hedging_draft response.pdf
- 20121026 - swisselectric response consultation Forward Risk Hedging Products.pdf
- 2012-10-26 FINAL JPM Response_ACER Risk Hedging Products.pdf
- 20121028_ACER_Forward Consultation - EDF Response.pdf
- 2013_02_01_LTRTF_Evaluation_Of_Responses.pdf
- 280112 BritNed response - ACER Long-term capacity rights.pdf
- ACER consultation - Forward Risk-Hedging Products 3.0.pdf
- AIGET ACER LT capacity allocation.pdf
- Assoelettrica - ACER consultation Forward Risk Hedging Products.pdf
- E ON Forward hedging.pdf
- Edison response ACER consultation Forward Risk Hedging Products.pdf
- EFET Response to ACER Consultation on FCA_261012.pdf
- EFET Response to ACER Consultation on FCA_261012_revised.pdf
- Energy Norway forward hedging answer.pdf
- EURELECTRIC Response to ACER Cslt.pdf
- Fortums response to Forward Hedging.pdf
- Forward risk hedging_ACER.pdf
- Forward Risk-Hedging Products ACER okt 2012.pdf
- Forward Risk-Hedging.pdf
- GDF SUEZ_ACER_consult_forward_23102012.pdf
- Iberdrola_Comments_ ACER_LongTerm_TransmRights.pdf
- SSE response, Long-term capacity allocation.pdf
- Statkraft Response to ACER consultation on forward risk-hedging.pdf
- Swedenergy response to ACER consultation Forward Risk Hedging products.pdf
PC_2012_E_15 - Public Consultation on Assessment of the Annual Cross-Border Infrastructure Compensation Sum
Status
Closed
Open:
16.10.2012
Close:
14.11.2012
Policy area
Contact information
Audience
Evaluation of responses and responses
No evaluation of responses available.
- 50Hertz Transmission GmbH.pdf
- Amprion.pdf
- APG_AUSTRIA.pdf
- Austrian Chamber of Labour.pdf
- CEPS.pdf
- Confederation of Norwegian Enterprise.pdf
- EDF Energy.pdf
- EDF.pdf
- ElCom.pdf
- Energy Norway.pdf
- Federation of Austrian Industries.pdf
- MAVIR.pdf
- National Grid.pdf
- NDC.pdf
- Nordic TSOs.pdf
- NVE.pdf
- OGB- Austrian Trade Union Federation.pdf
- REN.pdf
- RTE.pdf
- STATNETT.pdf
- Svenska Kraftnäts.pdf
- Swissgrid.pdf
- Technical University Sofia.pdf
- TENNET.pdf
- TERNA.pdf
- TransnetBW.pdf
PC_2013_E_05 - Pre-consultation on “Energy Regulation: A bridge to 2025” set of papers
Status
Closed
Open:
06.11.2013
Close:
17.12.2012
Policy area
Contact information
Audience
Evaluation of responses and responses
No evaluation of responses is available.
- BDEW response - Document 1.pdf
- BDEW response - Document 2.pdf
- BDEW response - Document 3.pdf
- BDEW response - Document 4.pdf
- BDEW response - Document 5.pdf
- British Gas response.pdf
- CEDEC response.pdf
- CEPI response.pdf
- CZ MIT response.doc
- E.ON response.pdf
- EDF Energy response.pdf
- EDF response.zip
- Edison SpA response.pdf
- EDSO response.pdf
- EFET response.pdf
- ENA response - Document 1.doc
- ENA response - Document 2.doc
- Enagás response.doc
- ENEL response - Document 1.pdf
- ENEL response - Document 2.pdf
- ENEL response - Document 3.pdf
- ENEL response - Document 4.pdf
- Energia response.pdf
- Energy UK Response.pdf
- ENI response - Document 1.pdf
- ENI response - Document 2.pdf
- ENI response - Document 3.pdf
- ENI response - Document 4.pdf
- ENTSO-E response.pdf
- EPIA response.pdf
PC_2013_E_04 - Public consultation on the influence of existing bidding zones on electricity markets
Status
Closed
Open:
31.07.2013
Close:
30.09.2013
Policy area
Contact information
Audience
Evaluation of responses and responses
No evaluation of responses is available.
In this public consultation 32
responses were received from the stakeholders.
- BDEW.pdf
- BNE.pdf
- CEDEC.pdf
- CEPS.pdf
- CEZ Group.pdf
- Czech Ministry of Industry and Trade.docx
- Danish Energy Association.pdf
- E.ON.pdf
- EDF.pdf
- Edison.pdf
- EEX.pdf
- EFET.pdf
- Electricity Association of Ireland.pdf
- EnBW.pdf
- EnergyNorway.pdf
- EPEX SPOT.pdf
- Eurelectric.pdf
- Europex.pdf
- Finnish Energy Industries.pdf
- Fortum.pdf
- GDF SUEZ.pdf
- IFIEC.pdf
- Oesterreichs Energie.pdf
- PSE.docx
- RWE.pdf
- Statnett.pdf
- SWEDENENERGY.pdf
- TIWAG.pdf
- UNESA.docx
- VERBUND AG.pdf
PC_2014_O_01 - European Energy Regulation: A Bridge to 2025
Status
Closed
Open:
29.04.2014
Close:
16.06.2014
Policy area
Contact information
Audience
Evaluation of responses and responses
- Bridge to 2025 Evaluation of responses to consultation paper
- Supporting document to ACER Recommendation 05-2014 - Energy Regulation A Bridge to 2025 Conclusions Paper
- Executive Summary
- 8KU GmbH.pdf
- A2A Trading.pdf
- Albwerk GmbH and Co. KG.msg
- Ampacimon.pdf
- BDEW.pdf
- Berlin Energie.pdf
- BEUC.pdf
- Bord Gáis Networks.docx
- Bord Gáis Networks.pdf
- Bundesverband Neuer Energieanbieter e.V._.pdf
- CECED.pdf
- CEDEC.pdf
- CEEP.pdf
- CEZ, a.s_.pdf
- Consultation_responses_log_23.06.14.xlsx
- Direct Energie.pdf
- E3G.pdf
- ECRB.docx
- ECRB.pdf
- EDF Energy.pdf
- EDF.docx
- EDF.pdf
- Edison SpA.pdf
- EDSO for Smart Grids.pdf
- EFET.pdf
- Elia Group.pdf
- ENA.docx
- ENA.pdf
- ENAGAS.pdf
- EnBW.pdf
PC_2014_E_08 - Joint Public Consultation ACER/ENTSO-E on the establishment of European Network Code Stakeholder Committees
Status
Closed
Open:
12.12.2014
Close:
23.01.2015
Policy area
Contact information
Audience
Evaluation of responses and responses
The Evaluation of the responses received during the public consultation as a summary document can be viewed
here. The Draft Terms of Reference, prepared by ACER and ENTSO-E on the basis of the feedback received in the public consultation process, can be read
here.
The Agency and ENTSO-E received 33 responses to this Joint Public Consultation on the establishment of European Network Code Stakeholder Committees (PC_2014_E_08), which can be viewed below.
- 01R EURELECTRIC_Response.pdf
- 02R RWE_Response.pdf
- 03R CEDEC-EDSO-GEODE_Response.pdf
- 04R Axpo_Response.pdf
- 05R EDF_Response.pdf
- 06R EON_Response.pdf
- 07R Europex_Response.pdf
- 08R COGEN Europe_Response.pdf
- 09R E3G_Response.pdf
- 10R Energy UK_Response.pdf
- 11R ECOS_Response.pdf
- 12R Edison_Response.pdf
- 13R EHI_Response.pdf
- 14R ELEXON_Response.pdf
- 15R EnBW_Response.pdf
- 16R EnelSpA_Response.pdf
- 17R Citizens Advice Bureau_Response.pdf
- 18R ESB GWM_Response.pdf
- 19R ESTELA_Response.pdf
- 20R EUGINE and Europgen_Response.pdf
- 21R EUTurbines_Response.pdf
- 22R EWEA_Response.pdf
- 23R GOT Energy_Response.pdf
- 24R Jukka_RANNILA_Response.pdf
- 25R Nordenergi_Response.pdf
- 26R Orgalime_Response.pdf
- 27R NGET_Response.pdf
- 28R Statkraft_Response.pdf
- 29R Swedenergy_Response.pdf
- 30R Vattenfall AB_Response.pdf
PC_2016_E_02 - Consultation on the definition of capacity calculation regions
Status
Closed
Open:
22.06.2016
Close:
20.07.2016
Policy area
Contact information
Audience
Evaluation of responses and responses
- AFEER.pdf
- American Chamber of Commerce in Romania.pdf
- Amprion.pdf
- ANRE.pdf
- Association for District Heating.pdf
- Austrian Federal Economic Chamber.pdf
- Austrian Power Grid.pdf
- BDEW.pdf
- CEZ.pdf
- Confederation of Industry of the Czech Republic.pdf
- Croatian Energy Regulatory Agency.pdf
- Cyprus Energy Regulatory Authority.pdf
- Economic Chamber of Non-Ferrous Metals and Recycling.pdf
- E-Control.pdf
- EDF.pdf
- EFET.pdf
- Electricity Association of Ireland.pdf
- Enel.pdf
- Energy Agency.pdf
- Energy Community Secretariat.pdf
- Energy Regulatory Office (URE).pdf
- ENTSO-E.pdf
- ERU.pdf
- EUELECTRIC.pdf
- EXAA Engery Exchange Austria.pdf
- Federation of Austrian Industries.pdf
- Federation of Belgian Industrial Energy Consumers.pdf
- Forum of End-users of Electricity and Gas.pdf
- GEN-I.pdf
- Hrvatska elektroprivreda.pdf
PC_2017_E_02 – Consultation on maximum and minimum clearing prices for single day-ahead and intraday coupling
Status
Closed
Open:
24.08.2017
Close:
15.09.2017
Policy area
Contact information
Audience
Evaluation of responses and responses
- No evaluation of responses available.
- 170915 Response ACM ACER consultation CACM_HMMP.pdf
- 170915_TSO answer to ACER consultation_final.pdf
- 2017 09 15 Réponse consultation ACER sur plafonds prix vF ENG.pdf
- 2017_09_14_Enel Response to ACER maximum and minimum clearing prices.pdf
- 2017_09_15_HMMP VIESGO_vdef_Redacted.pdf
- 2017-09 DE answer to ACER public consultation on price cap.pdf
- 20170911 Consultation on Clearing prices_Redacted.pdf
- 20170913_AG_Comments_ACER max-min-prices_20170915_Redacted.pdf
- 20170915_ACER consultation clearing prices - Iberdrola comments_Redacted.pdf
- 20170915_All NEMOs Response to ACER Consultation on CACM HMMP Methodology_final_Redacted.pdf
- 20170915_EPEX SPOT_ response_ACER_consultation_FINAL_Redacted.pdf
- ACER consultation on maximum and minimum clearing prices 4.0_Redacted.pdf
- ACER consults on the maximum and minimum prices in the day-ahead intraday coupling_Febeliec.pdf
- ACER MAX Pricing Consultation Answers.pdf
- ACER on Maximum and Minimum Clearing Prices_elfi.pdf
- ACER_maximum and minimum clearing prices_20170915_Redacted.pdf
- BDEW_STN ACER max_min_CP_MC_Redacted.pdf
- Cefic answers to consultation_Cefic.pdf
- Comments on the Maximum and minimum clearing prices for single day_jamtkraft.pdf
- Consultation answer HMMP Nordic NRAs_Energitilsynet.pdf
- Consultation on maximum and minimum clearing prices for single day-ahead and intraday coupling _Verbund.pdf
- Consultation on maximum and minimum clearing prices on wholesale electricity markets_plum energie.pdf
- Consultation PC_2017_E_02_HSE.pdf
- DIHK contribution PC_2017_E_02_Redacted.pdf
- EDF Group response_ACER consultation max-min clearing prices_vf_Redacted.pdf
- EFET_ACER consultation caps_15092017.pdf
- ENGIE answer acer price caps consultation.pdf
- E-NL response ACER min-max price limits_Redacted.pdf
- EURELECTRIC_ACER_Consultation_Maximum and minimum clearing prices for single day-ahead and intraday coupling_FINAL_Redacted.pdf
- Fortum response to ACER consultation 2017E02_Redacted.pdf
PC_2018_E_01 - Consultation on the cross-zonal gate opening and gate closure times for intraday coupling
Status
Closed
Open:
09.01.2018
Close:
30.01.2018
Policy area
Contact information
Audience
Evaluation of responses and responses
No evaluation of responses is available.
- 1 - HSE Group, Slovenia.pdf
- 10 - OTE, Czech Republic_Redacted.pdf
- 11a - NordREG.pdf
- 11b - NordREG (position paper).pdf
- 12 - Association of Energy Trading, Poland.pdf
- 13 - Gas Natural Fenosa, Spain.pdf
- 14 - All-NEMOs.pdf
- 15 - UNIPER, Germany.pdf
- 16 - EPEX.pdf
- 17 - URE_Redacted.pdf
- 18 - AXPO, Switzerland_Redacted.pdf
- 19 - CRE.pdf
- 2 - Channel TSOs_Redacted.pdf
- 20 - Enel, Belgium.pdf
- 21 - EDF, France_Redacted.pdf
- 22 - EFET.pdf
- 23 - ARERA_Redacted.pdf
- 24 - Direct energie, France.pdf
- 25 - EDP, Portugal.pdf
- 26 - Nord Pool.pdf
- 27 - Core TSOs.pdf
- 28 - ENTSO-E.pdf
- 3 - Vorarlberger Illwerke AG, Austria_Redacted.pdf
- 4 - EI, NVE, DERA.pdf
- 5 - UPM-Kymmene Corporation, Finland_Redacted.pdf
- 6 - Österreichs energie, Austria_Redacted.pdf
- 7 - TIWAG-Tiroler Wasserkraft AG, Austria.pdf
- 8 - Nordregi.pdf
- 9 - CEZ, Czech Republic.pdf